Repository navigation
ci(pm-stack): run projector tests on pull requests (#2936) - #5319
Merged
Merged
Conversation
pm-aggregator-tests.yml is the pm-stack PR workflow (pull_request, pm-stack/** paths) but only tested the aggregator; the projector suite ran only in pm-stack-tests.yml on push to main, after merge. Add a projector job mirroring the main workflow projector steps (bun install --frozen-lockfile + bun test in pm-stack/projector). Aggregator jobs, path scoping, and the non-required-check policy are unchanged. Projector suite verified on laptop: 79 pass, 0 fail.
|
Warning Review limit reachedYou've used all free OSS reviews for now. Wait for the free limit to reset to keep reviewing this public repository. Next included review available in 53 minutes. View limit details
Thanks for using CodeRabbit! It's free for OSS, and your support helps us grow. If you like it, consider giving us a shout-out. |
Codex Review SummaryThis comment shows the latest Codex review activity on this pull request.
ℹ️ About Codex in GitHubYour team has set up Codex to review pull requests in this repo. Reviews are triggered when you
Codex reacts with 👀 while any review is running, comments if it has suggestions, and reacts with 👍 once all reviews finish with no findings. |
3 tasks
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
What
Fixes the remaining PR-CI gap in #2936:
.github/workflows/pm-aggregator-tests.ymlis the pm-stack PR workflow (pull_request,pm-stack/**paths) but its jobs only tested the aggregator. The projector suite ran only in.github/workflows/pm-stack-tests.yml, which is push-to-main only — projector changes merged with no pre-merge test signal.Adds a
projectorjob to the PR workflow mirroring the main workflow's projector steps: checkout, setup-bun,bun install --frozen-lockfile,bun test, working directorypm-stack/projector. Aggregator jobs/coverage, thepm-stack/**path scoping, and the deliberately non-required-check policy are unchanged.Verification
contract,test,projector; triggers unchanged (push,pull_request,workflow_dispatch).pm-stack/**path filter except the workflow's own path entry), so the new job's first full run is expected on the next pm-stack PR or via workflow_dispatch.Closes #2936.
Open in [code]smith · Need help on this PR? Tag
@codesmith-botwith what you need.